Nikhil,
According to the report you attached, the labels of the variables in ADSL are incorrect. See the values on the Details worksheet in column E.
P02S1SDM, Start Datetime of Period 02 Subperiod 1
P02S1EDM, End Datetime of Period 02 Subperiod 1
P02S2SDM, Start Datetime of Period 02 Subperiod 2
P02S2EDM, End Datetime of Period 02 Subperiod 2
The labels you included in your original post are the correct labels.
Hi Team,
As per the requirement of our analysis we have created the subperiods for period 2 like PxxSw, PxxSwSDT, PxxSwSDM , PxxSwEDT and PxxSwETM in ADSL dataset as per ADaM IG 1.1 (Table 3.2.7).
Below are the variable names and Labels in the specification.
Variable Name Label
P02S1 Description of Period 02 Subperiod 1
P02S1SDT Period 02 Subperiod 1 Start Date
P02S1SDM Period 02 Subperiod 1 Start Datetime
P2S1EDT Period 02 Subperiod 1 End Date
P02S1EDM Period 02 Subperiod 1 End Datetime
P02S2 Description of Period 02 Subperiod 2
P02S2SDT Period 02 Subperiod 2 Start Date
P02S2SDM Period 02 Subperiod 2 Start Datetime
P2S2EDT Period 02 Subperiod 2 End Date
P02S2EDM Period 02 Subperiod 2 End Datetime
however while running the Pinnacle checks I'm getting error as "AD0018 Variable label mismatch between dataset and ADaM standard" for variables P02S1EDM & P02S2EDM .
Could you please let me know what is the issue with the Label?
Thanks in advance!
- Nikhil
Attached Files