Take a look at this thread: http://www.opencdisc.org/forum/sdtm-question-epoch-variable
Does that help answer your question?
In SE domain I am getting warning like "Variable is in wrong order within domain" even though I kept same order as per SDTM IG 3.2 and also I am using PINNACLE COMMUNITY 3.0.0. Could you please someone help me on this
Hi,
According to the latest Study Data Technical Conformance Guide, variable EPOCH should be included in a wide selection of domains.
Accordingly, I added EPOCH into CM domain only to have a warning saying "Variable is in wrong order within domain". I wonder on what Pinnacle 21 (by the way I used the latest version available 2.1.0) can assess that this variable is in the wrong order. I tried several different places in the domain and I always get this warning.
Based on SDTM 1.4, I thought it would make sense to put this variable before CMSTDTC but it doesn't work.
Any advice?
Thanks
Pierre